Sky Bus Metro Technology: A statement of responsibility made |
| ||||||
|
in public interest! |
|
|
|
|
| ||
|
Need: Cities are having limited urban space and any road based solution to decongest | |||||||
|
is self-defeating because mass transit cannot be suatained, as it demands urban space. | |||||||
|
|
|
|
|
|
|
|
|
|
Rail based rapid transit gives mass transport but elevated and underground options, | |||||||
|
have priced themselves out of current economy- they are now white elephants. |
| ||||||
|
|
|
|
|
|
|
|
|
|
The technology breakthrough is the Sky Bus Metro, flexible to follow exisiting roadways, | |||||||
|
but having rail based mass transit capacity- to deliver 300 to 400 commuters within | |||||||
|
20m length and 3m wiidth, at near to 100 kmph. Designed for rate of flow of commuters | |||||||
|
requires little land and allows existing traffic to continue, forms a grid for the city, | |||||||
|
providing point to point, air-condition service, eliminating additional expenditure on | |||||||
|
inter-modal transfer costs. |
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
The same time tested rail technology components are used, re-eingineered to improve | |||||||
|
stability and increase safety against derailments to create Sky Bus Metro technology. | |||||||
|
|
|
|
|
|
|
|
|
|
How a short bus of 20m length ( Bus is a misnomer- infact it is equal to normal coach | |||||||
|
length of a train- the same under-frame and wheel-bogies used- with two Sky Bus coaches | |||||||
|
each of 9.5 m suspended over the wheels, traveling on twin rail tracks overhead enclosed | |||||||
|
in a concrete box, with stations of length 50m only constructed at roadside providing | |||||||
|
access, handle 20,000 to 80,000 passengers per hour? |
|
|
| ||||
|
Headway-turn round times: |
|
|
|
|
| ||
|
In a railway, where a train of 200m has to negotiate 100m of turn out more than | |||||||
|
once to change tracks in a yard at low speeds of 15 kmph- means 300m traversing | |||||||
|
at low aspeed of 15 kmph.Hence turn round times of |
72 |
secs per one turn out | |||||
|
and finally adding the acceleration and deceleration times for 200m to come to a stop | |||||||
|
makes it difficult to achieve 60 second turn round times. |
|
|
| ||||
|
For the same signalling system, Sky Bus has less turn round time. |
|
| |||||
|
In Sky Bus it is a matter of 20m coach shifted by 5 mt at 1 m per second and acceleration | |||||||
|
and deceleration times for covering only 20m length for self-length, which makes it | |||||||
|
possible to have turn round times of less than one minute. |
|
| |||||
|
Skybus is a railway, which has eliminated derailments, and provided positive connection | |||||||
|
between the tracks and bogies, thus eliminating any chance of capsizing of coaches. | |||||||
|
So within 20m length , instead of lot of dead steel, Skybus carries more load of people. | |||||||
|
We can design to carry 300 to 430 persons per 20m length ,consisting of 2x9.5m units. | |||||||
|
Capacity: |
|
|
|
|
|
| |
|
At 300 to 400 persons per a 20m long Sky Bus consist per hour can handle at 1 min | |||||||
|
headway, 300 or 400 x 60x 2 directions= |
36000 |
pax or |
48000 |
per hour | |||
|
This is per one route. The use of two consists with total length of 40m only |
| ||||||
|
can give 72000 or 96000 pax per hour! This is what heavy underground metro also | |||||||
|
delivers. |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
A city can have 4 routes of 15 km each and 4 routes of 10 km cutting across |
| ||||||
|
forming a grid covering about 150 sq km which can provide commuter |
| ||||||
|
capacity to move 60 to 70 lac per day! The roads will be totally decongested! |
| ||||||
|
Financial overview: |
|
|
|
|
| ||
|
Existing cost for travel bus/auto + charge for metro, replaced by only Sky Bus charge. | |||||||
|
At a daily spend of Rs 50 per day on average for floating population of 5 lacs. |
| ||||||
|
and regular commuters of 30 lacs paying monthly Rs 500 per 1000km travel, |
| ||||||
|
we get annually Rs |
1800 |
cr plus |
900 |
cr from floating population. | |||
|
At Rs 55 cr perkm the 100 km costs Rs 5500 cr and running expenditure |
| ||||||
|
is about Rs 850 cr , leaving a balance of Rs 1850 cr per annum surplus! |
| ||||||
|
It means surplus |
34% |
of capital which makes the project |
| ||||
|
financially sustainable. In Mumbai 61 lac journeys take place on suburban rail. |
| ||||||
|
Safety: |
|
|
|
|
|
| |
|
The system is basically a railway with improved suspension systems and patented features. | |||||||
|
The norms for safety clearance for dynamic behaviour, as per railway rolling stock | |||||||
|
are applied and checked if any adverse results come because of suspended coaches | |||||||
|
below the wheels. The measurements were made by the RDSO( Research Designs and | |||||||
|
Standards Organisation, Ministry of Railways) during Jan 2005. |
|
| |||||
|
Speed |
Braking Distance meters |
Vertical |
|
Transverse |
|
Longitudinal |
|
|
Kmph |
|
Max accn g |
RI |
Max accn g |
RI |
Max accn g |
RI |
|
60 |
136 |
0.036 |
1.703 |
0.026 |
1.788 |
0.052 |
2.136 |
|
70 |
174 |
0.122 |
2.692 |
0.04 |
2.003 |
0.077 |
2.395 |
|
|
|
Excellent |
Excellent |
Excellent |
Excellent |
Excellent |
Excellent |
|
Permissible limits |
Max.Acceleration 0.3g going upto 0.35 g if no resonance is observed. | ||||||
|
|
|
Ride Index (RI): 3.25 normal , can go upto 4.0 for EMU and DEMU | |||||
|
|
|
|
|
|
|
|
|
|
Train control is as per Railway standards and Motorman driven observing |
| ||||||
|
Railway General rules.- even with this Sky Bus, a short unit of 20m,yields 1min headway. | |||||||
|
Structurally the Codes of Practice observed and the Schedule of Dimensions fixed ,moving | |||||||
|
checked to find that design and actual conditions in dynamic conditions are satisfactory. | |||||||
|
|
|
|
|
|
|
|
|
|
The performance is much better than the prescribed limits as evident from the figures. | |||||||
|
|
|
|
|
|
|
|
|
|
The World's First test track has yielded excellent results showing the superior behaviour of | |||||||
|
Sky Bus technology based Metro. |
|
|
|
| |||
|
Skybus is an improved railway technology- so as much proven as railway technology! | |||||||
|
Unique to Sky Bus metro- eco-friendly solution: |
|
|
| ||||
|
Eliminates need for polluting trucks enter the city and congest roads.- others cannot. | |||||||
|
Even after spending two to four times more for setting up the existing Metro |
| ||||||
|
technology based, elevated or underground metros, city will still suffer from problems of | |||||||
|
inter-modal bridging through buses, and for moving cargo into city as well as |
| ||||||
|
garbage removal, trucks still enter the city, polluting the same. |
|
| |||||
|
|
|
|
|
|
|
|
|
|
Only in the Sky Bus technology cargo as well as house keeping functions can |
| ||||||
|
be automatically be handled, eliminating trucks into city or carry trucks like in RO-RO | |||||||
|
service to the last point of dispersal- minimising or eliminating the pollution. |
| ||||||
|
|
|
|
|
|
|
|
|
|
Bharata Ratna Dr Abdul Kalam has described Sky Bus technology as gift of our |
| ||||||
|
nation to the world. |
|
|
|
|
| ||
|
The patent rights granted by USA and other countries are assigned by |
| ||||||
|
the inventor Mr. B. Rajaram FIE, FNAE, to the people of the country through |
| ||||||
|
Konkan railway Corprn. |
|
|
|
|
| ||
|
Way forward: |
|
|
|
|
|
| |
|
Government of India has to take a view to classify the Sky Bus to be under |
| ||||||
|
Railway Act or enact a parallel act called Sky Bus Metro Act to put in Safety Certification | |||||||
|
process for commercial runs as is done for Railways. Else straightaway adopt existing | |||||||
|
old Tramway Act 18xx, state controls. |
|
|
|
| |||
|
Konkan Railway has invited bids for technology licensing of the Sky Bus to private | |||||||
|
parties, to take up city wise on FBOT basis Sky Bus projects- they have to pay only | |||||||
|
Rs 5 cr royalty per route km , as one time payment to Konkan Railway Corporation. | |||||||
|
|
|
|
|
|
|
|
|
|
Common urbanite after travelling for 7 years at Rs 500 per month, gets a chance to | |||||||
|
travel free for life! |
|
|
|
|
|
| |
|
Sky Bus design, construction and performance can be assured to satisfy the prevailing | |||||||
|
international norms for such suspended rail based systems- and the average cost of | |||||||
|
Rs 36 cr per km including rolling stock at the test track , assures one that it is possible to | |||||||
|
construct Sky Bus at Rs 50 cr perkm in a commercial project. |
|
| |||||
|
Our Indian industry is capable of delivering commercial system this year. | |||||||
|
|
|
|
|
|
|
|
|
|
A vast business opportunity involvimg more than Rs 100,000 cr awaits to take |
| ||||||
|
off - delay in Governments taking a decision costs very dearly by allowing the old unsafe | |||||||
|
metro rails being laid at twice to four times the cost of Skybus-but still suffer from | |||||||
|
pollution of city as well as financial nightmare of sustaining the same for lifetime! | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B.Rajaram M.Tech., FIE.,FNAE |
| ||
|
|
|
|
|
Stated in public interest and |
| ||
|
|
|
|
|
signed as inventor & Former M.D. |
| ||
|
|
|
|
|
Konkan Railway Corporation Ltd., |
| ||
|
Flat 205/2-2-15, B9, Durgabai Deshmukh Colony,Hyderabad 500007 |
| ||||||
|
Email: rajaram.bojji@gmail.com URL: www.geocities.com/rajaram_bojji |
| ||||||
|
Tel. +91 40 274 00 365 |
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|